use the workspace edition (#2897) #7539
test.yml
on: push
build
4m 50s
benchmarking
4m 52s
checks-and-tests
4m 51s
e2e-tests
2m 7s
Annotations
8 errors
|
e2e-tests
Process completed with exit code 101.
|
|
benchmarking
The operation was canceled.
|
|
benchmarking
Canceling since a higher priority waiting request for Test-refs/heads/master exists
|
|
build
The operation was canceled.
|
|
build
Canceling since a higher priority waiting request for Test-refs/heads/master exists
|
|
Test
Canceling since a higher priority waiting request for Test-refs/heads/master exists
|
|
checks-and-tests
The operation was canceled.
|
|
checks-and-tests
Canceling since a higher priority waiting request for Test-refs/heads/master exists
|