Skip to content

Bump actions/checkout from 2 to 4 #9

Bump actions/checkout from 2 to 4

Bump actions/checkout from 2 to 4 #9

Re-run triggered May 16, 2025 12:36
Status Failure
Total duration 1m 9s
Artifacts

project-ci.yaml

on: pull_request
Matrix: MDAnalysis Compatibility Tests
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run tests (3.13)
Process completed with exit code 1.
Run tests (3.12)
Process completed with exit code 1.
Run tests (3.12)
The strategy configuration was canceled because "tests._3_13" failed
Run tests (3.11)
Process completed with exit code 1.
Run tests (3.11)
The strategy configuration was canceled because "tests._3_13" failed