Skip to content

Merge pull request #225 from GREENRAT-K405/update/concoredocker-with-… #55

Merge pull request #225 from GREENRAT-K405/update/concoredocker-with-…

Merge pull request #225 from GREENRAT-K405/update/concoredocker-with-… #55

Triggered via push February 8, 2026 20:50
Status Failure
Total duration 1m 15s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.