Milestones

List view

  • 20 hours: final cleanup of diagnostic plots and output summaries, with possible addition of customization options

    Overdue by 8 year(s)
    Due by February 28, 2017
  • 40 hours: add Beale’s ratio estimator R subroutine (provided by MD developer) to the package either as an additional method or as a diagnostic metric.

    Overdue by 8 year(s)
    Due by February 28, 2017
  • ~24-40 hours: [blog post for] multi-model execution (e.g., interpolation, 5-parameter Loadest regression, composite method) with output (diagnostic plots in PDFs; CSV or text model summary metrics, including period of record, record length, long-term mean load for SPARROW, etc.) generated. Multi-site output should be directed to a single file (CSV, PDF), allowing the user to scroll through the site diagnostics and summary statistics.

    Overdue by 9 year(s)
    Due by January 28, 2017
    12/12 issues closed
  • 24 hours: Summary function[s] to generate multi-panel figures, multi-statistic tables, tables that compare models, and/or pdf/html output file with multiple parts

    Overdue by 9 year(s)
    Due by January 14, 2017
    2/2 issues closed
  • 16 hours: Prediction/comparison plots for all models shown simultaneously: concentration or flux vs time, aggregate concentration and/or flux vs time period; predictions with uncertainties

    Overdue by 9 year(s)
    Due by January 14, 2017
    0/2 issues closed
  • 40 hours: Diagnostic plots: Concentration/flux vs. time, Concentration vs discharge, residuals vs ln(estimated concentration), residuals versus discharge, residuals vs time, residuals vs month, boxplot of observed & estimated concentrations by day type, observed vs estimated concentrations, boxplot of discharge on sampled days and all days, observed vs estimated flux, composite correction vs time, predictions vs time w/ composite correction shaded

    Overdue by 9 year(s)
    Due by January 14, 2017
    11/13 issues closed