Last updated: 2026-07-21
How to read this file: Quantitative claims and program status facts map to the Evidence Index and carry an evidence class. Metrics without a public re-run path are company-attested (ATTESTED-INTERNAL), not third-party certified and not re-executable by outsiders from this repository alone. See the Public Claim Ledger Charter.
Grade glossary (do not conflate):
| Label | Domain | Meaning |
|---|---|---|
| MC trust A / A+ | Mission Control governance maturity (company internal scale) | Not App Store grade; not product release-candidate grade |
| IV product RC A | Investment Vault product release-candidate packaging quality | Not store-submission readiness |
| IV MVP readiness B | Completeness of core MVP vs limited remaining work | Not store readiness; not RC packaging alone |
| IV App Store C | App Store submission readiness audit (as composed) | Not a unit-test score; not product RC grade |
Status vocabulary used below: Implemented, Verified, Under Development, Planned, Deferred, Experimental, HOLD, Not publicly released.
| Field | Value | Evidence class |
|---|---|---|
| Latest public report | Responsibility Infrastructure thesis v1.0 | PUBLIC-ARTIFACT |
| Published | 2026-07-18 | PUBLIC-ARTIFACT |
| Status | Published working thesis | PUBLIC-ARTIFACT |
| History note | 2026-07-18 thesis publication | PUBLIC-ARTIFACT |
Does not claim completed scientific experiment or universal validation.
| Field | Value | Evidence class |
|---|---|---|
| Latest closed milestone | M1-A+ — A+ trust maturity upgrade (closed 2026-07-21) | ATTESTED-INTERNAL |
| Prior milestone | M1 — experimental vertical slice (closed 2026-07-20) | ATTESTED-INTERNAL |
| Program status | Experimental governed program; trust-maturity hardened on M1 architecture; not a permanent production control plane | ATTESTED-INTERNAL |
| M1 verification (at M1 close) | Build PASS; 112/112 automated tests PASS | ATTESTED-INTERNAL |
| M1 test-count progression | 90/90 → 103/103 → 112/112 across layer closures | ATTESTED-INTERNAL |
| M1-A+ verification | 201/201 Mission Control automated tests PASS; 13/13 A+ adversarial tests PASS | ATTESTED-INTERNAL |
| Trust maturity grade | A → A+ (company internal scale as scoped; not third-party certification) | ATTESTED-INTERNAL |
| Next milestone | M2 — reserved; not started; not authorized by M1 or M1-A+ | ATTESTED-INTERNAL |
| History notes | M1; M1-A+ | Notes: PUBLIC-ARTIFACT |
| Architecture | ARCHITECTURE_OVERVIEW.md — five named conceptual layers (M1 scope) | ATTESTED-INTERNAL |
| Component (conceptual layer) | Status |
|---|---|
| Authority foundation | Implemented — Verified (M1); trust-maturity extended (M1-A+) |
| Request governance | Implemented — Verified (M1 bounded scope) |
| State derivation | Implemented — Verified (M1 bounded scope) |
| Lifecycle enforcement | Implemented — Verified (M1 bounded scope) |
| Runtime scheduling integration | Implemented — Verified (M1 bounded scope) |
| Trust maturity (authority completeness, custody boundaries, lineage, AI labor governance, continuous governance validation) | Implemented — Verified (M1-A+ bounded scope) |
| Production control-plane expansion | Deferred — not started |
| M2 milestone | Deferred — reserved, not started, not authorized |
Hostile-review process fact (M1): an incorrect channel/actor acceptance path was found under hostile review and corrected so invalid sources become durable rejections. Mechanism detail internal. See M1 history note.
M1-A+ process fact: production signer custody is fail-closed against development/CI local custody classes; mission lineage is checked by a separate company-internal automated lineage verifier as scoped (ATTESTED-INTERNAL — not third-party attestation). Mechanism detail internal.
Most recent completed multi-cycle external gold-standard adversarial validation campaign (aggregate only; methodology and case detail internal). Classification labels are public short forms of internal EXTERNAL_VALIDATION_* outcomes.
| Cycle (public label) | Cases executed | Execution failures | Overall objective accuracy | Classification | Min threshold | Strong threshold | Elite threshold |
|---|---|---|---|---|---|---|---|
| Cycle 1 | 500 | 0 | 49% | Failed | No | No | No |
| Cycle 2 | 500 | 0 | 65% | Failed | No | No | No |
| Cycle 3 | 500 | 0 | 94% | Partial | Yes | No | No |
| Cycle 4 (most recent) | 500 | 0 | 100% | Strong | Yes | Yes | No |
| Field | Value | Evidence class |
|---|---|---|
| Unsafe PROCEED count (campaign scoring summaries used) | 0 | ATTESTED-INTERNAL |
| Hallucination / unsupported-claim count | 0 | ATTESTED-INTERNAL |
| History note | Gold-standard campaign | ATTESTED-INTERNAL |
| Correction | Earlier public surface showed final cycle only; full progression published Phase 2 — CORR-2026-001 | PUBLIC-ARTIFACT |
Does not claim elite threshold, third-party attestation, or production readiness.
| Field | Value | Evidence class |
|---|---|---|
| Product status | Under Development — not publicly released | ATTESTED-INTERNAL / product narrative also on doghouse-public |
| Mission | Evidence-first investment history reconstruction from statements and related records | Product doctrine |
| Not | Brokerage, portfolio tracker, or investment adviser | Product doctrine |
| Material milestone 2026-07-15 | MVP audit remediation — eight verified gaps closed (edit candidates, period gaps, summaries/PDF, case close, build cleanup, app-boundary network tests, live black-box incl. tamper detection) | ATTESTED-INTERNAL |
| History notes | MVP audit remediation; Verification & readiness | Notes: PUBLIC-ARTIFACT |
These are adjacent same-day missions with different questions. Order is intentional for clarity of evidence:
| Order | Evaluation | Question answered | Result | Evidence class |
|---|---|---|---|---|
| 1 | App Store readiness audit (read-only) | Submit as composed? | C — significant work required; not “submit today”; audit also recorded unit tests under Xcode fail to compile (module unresolved) at audit time | ATTESTED-INTERNAL |
| 2 | Test infrastructure repair | Do unit tests pass after repair? | 94 passed / 0 failed; product code unchanged for that mission | ATTESTED-INTERNAL |
| 3 | MVP release-candidate packaging | Product RC quality / build? | Release build succeeded; unit tests 94 passed / 0 failed; product graded A as product release candidate; Connect/TestFlight upload founder-owned (not claimed completed) | ATTESTED-INTERNAL |
| 4 | MVP readiness evaluation (read-only) | How complete is the core MVP? | B — core MVP exists but needs limited completion work | ATTESTED-INTERNAL |
| 5 | Truthfulness remediation | Honesty/first-run presentation? | Completed; release simulator build succeeded | ATTESTED-INTERNAL |
| 6 | App Store compliance hardening | Privacy Manifest wiring? | Manifest added/wired/verified in Release app bundle; release build succeeded; does not override readiness audit C | ATTESTED-INTERNAL |
Reading rule: RC grade A ≠ MVP readiness B ≠ App Store readiness C. Passing unit tests after repair do not authorize store submission.
Does not claim App Store submission, universal document coverage, or investment advice.
| Field | Value | Evidence class |
|---|---|---|
| Product status | Under Development — not publicly released | ATTESTED-INTERNAL |
| Mission | Reviewer-ready proof packages from scattered records and timelines | Product doctrine |
| Primary validation lane | Insurance-claim proof packages | ATTESTED-INTERNAL |
| Gate determination (2026-07-17) | HOLD FOR MARKET VALIDATION | ATTESTED-INTERNAL |
| Planning readiness | READY | ATTESTED-INTERNAL |
| Market readiness | Not yet proven | ATTESTED-INTERNAL |
| Production build authorization | Not granted | ATTESTED-INTERNAL |
| Real customer data authorization | Not granted | ATTESTED-INTERNAL |
| History note | Readiness gate HOLD | Note: PUBLIC-ARTIFACT |
Does not claim pilots, insurer acceptance, legal sufficiency, or production feature delivery.
| Field | Value | Evidence class |
|---|---|---|
| Role | Internal operating environment / workbench for governed AI-assisted work | ATTESTED-INTERNAL |
| Commercial product? | No | Explicit |
| Public engineering face | Mission Control M1 + M1-A+ + validation aggregates + thesis | See above |
| Field | Value | Evidence class |
|---|---|---|
| Governance activation | 2026-07-20 — supreme Constitution ratified/activated for operations (summary only) | ATTESTED-INTERNAL |
| Publication controls | Publication Safety Gate enrolled on this repository; policy DHV-PUB-001 | Mixed: enrollment docs PUBLIC-ARTIFACT; gate run results ATTESTED-INTERNAL |
| History note | Governance activation | Note: PUBLIC-ARTIFACT |
Full constitutional text remains internal.
| Check | Result | Evidence class |
|---|---|---|
| Publication Safety Gate | PASS required before public push; enrollment documented 2026-07-20; tree re-checked after Phase 2 (2026-07-20) and M1-A+ admission (2026-07-21) content | ATTESTED-INTERNAL / process docs PUBLIC-ARTIFACT |
| Working tree policy | Clean tree preferred before release commits | Process |
No committed multi-year public roadmap is published here. Reserved milestones (e.g. Mission Control M2) are not started and not authorized merely by prior closes. This file is updated when a future milestone or gate determination formally closes and clears the Publication Safety Gate.
See docs/PROGRAMS.md.