| timezone |
|---|
Asia/Dubai |
-
自我介绍 大家好我是 lllapland,爱好和饭碗都是写代码,智能合约萌新。
-
你认为你会完成本次残酷学习吗? 根据以往经验不会完成,但是我会尽力完成。我自控力比较差,一般被push的时候效果最好(逃)。
- Free Software movement
- UNIX (1960s): Modular design, key to Ethereum's architecture; Bell Labs' open collaboration mirrors Ethereum's core development.
- Free Software Movement: Led by Richard Stallman, emphasizing software freedom and open source principles
- FOSS (Free & Open Source Software): Software that respects users' freedom and community
- GNU: Foundation for open-source software, influencing Ethereum's development principles. GNU stands for "GNU's Not Unix"
- Cryptography
Characteristic Symmetric Encryption Asymmetric Encryption Key Usage same key for encryption & decryption public/private key pair Security less secure if key is exposed more secure; only private key must be kept secret Speed faster (simpler computation) slower (complex mathematical operations) Key Distribution requires secure key exchange public key can be shared openly Common Algorithms AES, DES, RC4 RSA, ECC, Diffie-Hellman Use Cases encrypting files, database security digital signatures, 🌟 blockchain, secure communication (TLS, PGP)
- Clients: Implementations of the Execution Layer (EL) or Consensus Layer (CL).
- EL clients: Geth, Nethermind, Besu
- CL clients: Prysm, Lighthouse, Teku
- Nodes: Computers running both an EL and CL client, actively participating in the Ethereum network.
stf(parentBlock: Block, curBlock: Block, state: State): [State, Error]stf-> state transition function- verify header
- merkle roots
- gas limit
- timestamp
- etc.
- verify and process a block
build(env: Environment, pool: TransactionPool, state: State): [Block, State, Error]- construct a new block from environment, transaction pool, and current state
- valid blocks that were mined but not included in the canonical chain ( usually due to network delays or simultaneous block production by multiple miners)
- Why exist?
- for miners to include uncle blocks in new blocks and receive additional rewards
- to improve security and reduce centralization by compensating valid but orphaned blocks
- Why exist?
| Client | Language | Why Chosen? |
|---|---|---|
| Geth | Go | easy concurrency, large developer community, mature ecosystem |
| Erigon | Go | optimized storage, improved sync speed 💡 |
| Nethermind | C# | suitable for .NET ecosystem, enterprise-friendly |
| Besu | Java | hyperledger compatibility, enterprise-level support |
| Reth | Rust | high performance, memory safety |
| Comparison | Execution Layer (EL) | Consensus Layer (CL) |
|---|---|---|
| Main Function | processes transactions, executes smart contracts | validates blocks, runs PoS consensus |
| Core Components | EVM, Transaction Pool, State Database | Beacon Chain, Validators, Slot/Epoch Mechanism |
| Runs PoS? | ❌ No | ✅ Yes |
| Consensus Role | executes transactions but does not determine consensus | runs PoS rules, decides block validity |
| Client Examples | Geth, Erigon, Nethermind | Prysm, Lighthouse, Teku, Nimbus |
| Stored Data | account balances, smart contracts, transaction history | validator registry, voting data, finality information |
Before The Merge, Ethereum used a PoW (Proof of Work) + Execution Layer model, where a single client handled both consensus (mining) and transaction execution, leading to several issues:
- High computational cost (electricity).
- Slow blockchain synchronization (the continuously growing state increased sync time).
- Inefficient consensus mechanism (PoW was difficult to optimize).
After The Merge, Ethereum split into Execution Layer (EL) + Consensus Layer (CL), offering key advantages:
- Execution Clients focus on transaction execution and performance optimization
- Consensus Clients handle PoS rules, improving security and decentralization
- EL and CL can be upgraded independently, enhancing flexibility 🌟
via the Engine API,
- CL requests EL to provide a new block
- EL executes the block and returns the execution result
- CL decides whether to accept the new block through validator voting.
- arithmetic (add, mod, etc.)
- bitwise
- environment (block context, etc.)
- system (call, create, storage, return, etc.)
- control flow (branch, jump, etc.)
- stack (push, pop, etc.)
- memory (load, store, etc.)
- Execution layer operates** on devp2p (ethereum's p2p protocol).
- devp2p allows nodes to support different sub-protocols:
- eth/68, eth/69 – for transaction and state synchronization.
- snap – for fast state synchronization.
- optimizations:
- quickly syncing new nodes by fetching flat state data instead of reconstructing the Merkle Patricia Trie.
- uses batch requests (
GetAccountRange,GetStorageRanges) to efficiently retrieve account and contract storage data. - reduces disk I/O by eliminating deep MPT traversals, improving sync speed.
- outcome:
- enables nodes to complete state synchronization in 3-6 hours instead of days.
- optimizations:
- les – for light clients.
- features
- efficiently communicate and synchronize data.
- support different types of clients (full nodes, light clients, etc.) 💡
- devp2p allows nodes to support different sub-protocols:
- Responsibility
- historical data
GetBlockHeaderGetBlockBodiesGetReceipts- etc.
- pending transactions
TransactionsNewPooledTransactionHashes- notifies peers of new pending transactions by sharing only their transaction hashes, reducing bandwidth usage
GetPooledTransactions- etc.
- state
- how to make digital scarcity?
- solution: don't have a single trusted operator
- how to remove single trusted operator?
- solution: consensus via "state machine replication"
- BFT: byzantine fault tolerance
-
2PC: two-phase commit protocol
- prepare phase (each participant submit a binary vote for commit or abort)
- commit phase (if all participants vote commit, then execute the command)
-
PBFT: practical byzantine fault tolerance
- utilizes message signatures and multiple rounds of voting to reach consensus.
-
| Feature | PBFT (Practical Byzantine Fault Tolerance) | 2PC (Two-Phase Commit) |
|---|---|---|
| Objective | tolerates malicious nodes | ensures all databases either commit or rollback a transaction consistently |
| Fault Tolerance Model | Byzantine Fault Tolerance (BFT), capable of handling malicious nodes | Crash Fault Tolerance (CFT), only handles node crashes but cannot tolerate malicious behavior |
| Applicable Scenarios 🌟 | blockchain (Hyperledger, Tendermint, HotStuff, etc.) | distributed databases & transaction management (MySQL, PostgreSQL, distributed storage) |
| Voting Mechanism | voting + signature authentication, consensus is reached if more than 2/3 agree | unanimous agreement required, if any participant votes "abort", the transaction is rolled back |
| Communication Complexity | O(n²) -> multiple rounds of message exchanges, where each node broadcasts messages to all other nodes 🌟 | O(n) |
- PoS
- in-protocol signal allow for penalties, not just rewards (compared to PoW)
- scenarios:
- double signing
- going offline
- equivocation -> voting for multiple competing blocks at the same height 💡
- how?
- slashing: cutting validator's stake for malicious behavior (up to 32 ETH)
- inactivity leak: gradual stake reduction for being offline to maintain network liveness
- benefits:
- reduce attack surface
- less resource intensive
- scenarios:
- in-protocol signal allow for penalties, not just rewards (compared to PoW)
- Bribe attacks -> attackers influence validator behavior through economic incentives
- examples:
- paying validators to vote for specific blocks
- bribing validators to stay offline
- mitigations:
- slashing penalties make bribe acceptance more costly than potential gains
- withdrawal delays increase the cost of malicious behavior
- examples:
- GHOST vs. Casper
- ethereum 2.0's consensus mechanism uses a modified version of GHOST combined with Casper FFG (Finality Gadget)
| Mechanism | Purpose | Consensus Type | Key Features |
|---|---|---|---|
| GHOST | fork-choice rule to determine the canonical chain | PoW & PoS | • usually considers the entire tree of blocks (special case: LMD-GHOST looks at validators' latest messages) • chooses the heaviest subtree • prevents short-chain attacks |
| Casper FFG | finality gadget for PoS consensus | PoS | • checkpoint-based finalization • uses validator voting • provides economic finality through slashing |
- Attestation: statement or proof of a certain fact
- Ethereum's PoS consensus tutorial
- epoch -> a time unit used to organize validator duties and finalize blocks efficiently
- 1 epoch = 32 slots (Each slot is 12 seconds)
- 1 slot = opportunity to propose a block
- How to?
- a validator is selected to propose a block in each slot
- other validators attest using BLS signatures (aggregating hundreds of signatures into a single signature)
- validators are assigned to different committees
- each committee is responsible for validating specific shards
- attestations are aggregated and included in the next block
- epoch ends after 32 slots (~6.4 min)
- If 2/3 validators agree, finalization occurs
- epoch -> a time unit used to organize validator duties and finalize blocks efficiently
- EAS: Ethereum Attestation Service 🔥 tutorial
- usage cases / ideas
- identity
- statements
- etc.
- usage cases / ideas
- Ethereum's PoS consensus tutorial
- EVM Testing
- key characteristics
- pre-state
- accounts with balances etc.
- environment
- timestamp etc.
- transaction(s)
- origin
- destination
- ether value
- gas limit
- etc.
- post-state
- accounts with balances etc.
- pre-state
- State Testing <> Fuzzy Differential State Testing
- key characteristics
| Feature | State Testing | Fuzzy Differential State Testing |
|---|---|---|
| Testing Goal | verify a single client’s state transitions | compare multiple clients to detect state inconsistencies |
| Input Generation | predefined, deterministic transactions or state changes | fuzzing (randomly generated or mutated transactions) |
| Execution | single client | multiple clients (e.g., Geth, Nethermind, Besu) |
| Types of Issues Detected | - EVM computation errors - state update errors - smart contract execution issues |
- client implementation differences - potential consensus forks |
| Use Cases | - ensuring a client follows Ethereum protocol - regression testing in CI/CD - validating EIP implementations |
- identifying network-wide inconsistencies - preventing hard forks due to state mismatches |
| Complexity | controlled, predictable inputs | higher complexity due to unexpected fuzzing cases |
-
Blockchain Negative Testing
-
transaction-level negative testing
- case: construct a transaction with an excessively large nonce and check if the client correctly rejects it
-
smart contract negative testing
- case: attempt to trigger an integer overflow
-
network-level negative testing
- case: simulate a DDoS attack by sending a large number of junk transactions or requests to nodes
-
consensus mechanism negative testing
- case: construct two transactions with the same
noncebut differenttoaddresses and check if the PoS/PoW mechanism correctly handles the conflict - test objective: ensure that the client does not cause a consensus divergence due to mismatched transaction states
- case: construct two transactions with the same
-
data storage negative testing
- case: provide a tampered block header (with an incorrect merkle root)
- test objective: ensure that the node correctly rejects a manipulated block
-
-
ethereum tests
-
ethereum/execution-spec-tests (EEST) doc
- ethereum/consensus-specs
(Execution + Consensus) (E2E testing)
- Hive 💡
-
✅ Suitable for
- ethereum PoS EL-CL interaction testing
- fork upgrade compatibility
- cross-client interoperability –> verifies different EL-CL client pairings work together
- stability under network issues –> simulates delays, packet loss, and failures.
-
❌ Not suitable for
- fuzz testing –> runs structured tests, not random input-based bug detection.
- standalone EVM execution –> focuses on EL-CL, not individual transaction processing
- isolated EL or CL testing –> designed for their integration, not single-layer testing
-
- Devnets <> Shadow-Forks <> Testnets
| Category | Purpose | Characteristics | Use Cases |
|---|---|---|---|
| Devnets | local or private testing environment | customizable, fully controlled | internal team development, rapid iteration |
| Shadow Forks | simulate the mainnet environment | real blockchain data, non-disruptive | mainnet upgrade simulation, MEV analysis |
| Testnets | public testing environment | open access, free test tokens | DApp deployment, wallet & DeFi compatibility |
- Execution layer security
| category | risk | impact | mitigation | attack example |
|---|---|---|---|---|
| Valid invalidation | mistakenly rejecting valid transactions | consensus forks, transaction failures | consensus testing, transaction replay tests, proper evm rule adaptation | clients misinterpreting evm updates, causing certain transactions to be rejected |
| Invalid validation | mistakenly accepting invalid transactions | network pollution, fund loss | formal verification, state rollback, strict evm rule enforcement | ❗️ integer overflow in smart contracts allowing unauthorized withdrawals |
| DoS during execution | excessive resource consumption during transaction execution | transaction delays, node crashes, network congestion | 💡 gas fee optimization, contract execution limits, monitoring and detection | ❗️ recursive contract calls (e.g., gas griefing) to consume block resources |
- Consensus layer security
- faulty clients and finalization
- if < 1/3 of nodes fail, the network can reach finality.
- if > 1/2 of nodes fail, the network may lose consensus and enter an uncertain state.
- if > 2/3 of nodes are attacked or controlled, ethereum could finalize the wrong chain, causing major risks.
- faulty clients and finalization
| Faulty node percentage | Impact |
|---|---|
| < 33% | may cause missed slots, but finalization is not affected |
| 33%+ | delayed finality, block confirmation takes longer, but the chain continues |
| 50%+ | may disrupt forkchoice, leading to network uncertainty and a non-finalized state, where users cannot be sure if their transactions are permanently recorded. |
| 66%+ | may finalize an incorrect chain 💀, causing severe consequences |
- The Merge - PoS
- transition from Proof of Work (PoW) to Proof of Stake (PoS)
- The Surge
- scalability improvements with rollups and sharding.
- The Scourge - less MEV downsides
- addressing censorship resistance and decentralization issues
- The Verge - easier verification
- introduction of Verkle Trees to optimize data storage
- The Purge - simpler protocol
- pruning old state data to reduce node storage requirements
- The Splurge
- miscellaneous upgrades and optimizations.
