fix(evals): persist inline dataset runs without version ids #2224
pull-request.yml
on: pull_request
Commitlint
12s
PostgreSQL Integration Tests
29s
Matrix: build
Matrix: lint
Matrix: test-packages
Annotations
13 errors
|
Lint (Node 20)
Process completed with exit code 1.
|
|
Lint (Node 22)
The strategy configuration was canceled because "lint._20" failed
|
|
Lint (Node 22)
The operation was canceled.
|
|
Lint (Node 24)
The strategy configuration was canceled because "lint._20" failed
|
|
Lint (Node 24)
The operation was canceled.
|
|
Build (Node 24)
Canceling since a higher priority waiting request for refs/pull/1108/merge-pr-build-24 exists
|
|
Build (Node 24)
The operation was canceled.
|
|
Test core
Canceling since a higher priority waiting request for refs/pull/1108/merge-test-core exists
|
|
Test core
The operation was canceled.
|
|
Build (Node 22)
Canceling since a higher priority waiting request for refs/pull/1108/merge-pr-build-22 exists
|
|
Build (Node 22)
The operation was canceled.
|
|
Build (Node 20)
Canceling since a higher priority waiting request for refs/pull/1108/merge-pr-build-20 exists
|
|
Build (Node 20)
The operation was canceled.
|