Skip to content

Latest commit

 

History

History
511 lines (486 loc) · 59.8 KB

File metadata and controls

511 lines (486 loc) · 59.8 KB

Current State Baseline

This note records the reviewed post-merge Phase 67 stop-state target after the Phase 67 blueprint calibration and minimum-loop value closeout. PR #452 merged the subagent-reviewed auto-merge policy baseline, PR #456 synced the Phase 58 gate, PR #457 reproduced tracked route-readiness smoke evidence, and PR #458 closed Phase 58. Phase 59 is closed after #459 closed by PR #464, #460 closed by PR #462, and #461 closed by PR #463. Phase 60 is closed after #465 closed by PR #470, #466 closed by PR #468, and #467 closed by PR #469; milestone Phase 60 - Selected-World Review Artifact Integrity Gate is closed, and Phase 60 selected-world review artifact integrity evidence remains historical baseline.

Phase 61 is closed as Phase 61 - Selected-World Review Surface Evidence Binding Gate. The closed queue contains #471 Phase 61 exit gate closed by the Phase 61 closeout PR, #472 Phase 61: sync repo truth after Phase 60 closeout and define review surface evidence gate closed by PR #474, and #473 Phase 61: add selected-world review surface evidence binding smoke closed by PR #475. The milestone is closed, audit-github-queue reports paused with no active milestone, and the Phase 61 gate lives in docs/plans/phase-61-selected-world-review-surface-evidence-binding-gate-2026-05-23.md. It covers selected-world review surface evidence binding only. The #473 selected-world review surface evidence binding note lives in docs/plans/phase-61-selected-world-review-surface-evidence-binding-2026-05-23.md and is reproduced by scripts/smoke_phase61_selected_world_review_surface_binding.py.

Phase 62 is closed as Phase 62 - Selected-World Review Evidence Actionability Gate. The closed queue records that milestone Phase 62 - Selected-World Review Evidence Actionability Gate is closed, #477 Phase 62 exit gate closed by the Phase 62 closeout PR, #478 Phase 62: sync repo truth after Phase 61 closeout and define review evidence actionability gate closed by PR #480, and #479 Phase 62: add selected-world review evidence actionability smoke closed by PR #481. audit-github-queue reports paused with no active milestone after closeout, and the Phase 62 gate lives in docs/plans/phase-62-selected-world-review-evidence-actionability-gate-2026-05-25.md. The Phase 62 actionability evidence note lives in docs/plans/phase-62-selected-world-review-evidence-actionability-2026-05-25.md and is reproduced by scripts/smoke_phase62_selected_world_review_actionability.py. Phase 61 selected-world review surface evidence binding is the historical baseline. Phase 62 covers selected-world review evidence actionability through read-only review readiness and next-action signals only.

Closeout shorthand: #477 closed by the Phase 62 closeout PR; #478 closed by PR #480; #479 closed by PR #481; #484 closed by PR #486; #485 closed by PR #487; #483 Phase 63 exit gate closed by PR #488; #490 closed by PR #492; #491 closed by PR #493; #489 Phase 64 exit gate closed by PR #494; #496 closed by PR #498; #497 closed by PR #499.

Phase 63 is closed as Phase 63 - Selected-World Review Next-Action Route-Fidelity Gate. The closed queue records that milestone Phase 63 - Selected-World Review Next-Action Route-Fidelity Gate is closed, #483 Phase 63 exit gate closed by PR #488, #484 Phase 63: sync repo truth after Phase 62 closeout and define selected-world review next-action route-fidelity gate closed by PR #486, and #485 Phase 63: add selected-world review next-action route-fidelity smoke closed by PR #487. audit-github-queue reports paused with no active milestone after Phase 63 closeout. The Phase 63 gate lives in docs/plans/phase-63-selected-world-next-action-route-fidelity-gate-2026-05-25.md. Phase 62 selected-world review evidence actionability is the historical baseline. Phase 63 covers selected-world review next-action route fidelity only. The route-fidelity evidence lives in docs/plans/phase-63-selected-world-review-next-action-route-fidelity-2026-05-26.md and is reproduced by scripts/smoke_phase63_selected_world_review_next_action_route_fidelity.py; it proves read-only nextAction cues map only to existing world-scoped follow-up paths.

Phase 64 is closed as Phase 64 - Selected-World Perturb Follow-Up Readiness Gate. The closed queue records that milestone Phase 64 - Selected-World Perturb Follow-Up Readiness Gate is closed, #489 Phase 64 exit gate closed by PR #494, #490 Phase 64: sync repo truth after Phase 63 closeout and define selected-world perturb follow-up gate closed by PR #492, and #491 Phase 64: add selected-world perturb follow-up readiness smoke closed by PR #493. audit-github-queue reports paused with no active milestone after Phase 64 closeout. Phase 63 is closed after PR #488, and #483 Phase 63 exit gate closed by PR #488. The Phase 64 gate lives in docs/plans/phase-64-selected-world-perturb-followup-readiness-gate-2026-05-26.md; the Phase 64 perturb follow-up readiness evidence lives in docs/plans/phase-64-selected-world-perturb-followup-readiness-2026-05-26.md and is reproduced by scripts/smoke_phase64_selected_world_perturb_followup_readiness.py. Phase 63 selected-world review next-action route fidelity is the historical baseline. Phase 64 covers selected-world perturb follow-up readiness only: selected-world perturb routes stay reachable, world-scoped, bound to world-local perturbation presets, and backed by decision schema defaults without starting sessions, generating branches, or calling POST/runtime APIs.

Phase 65 is closed as Phase 65 - Selected-World Deterministic Runtime Generation Evidence Gate. Phase 64 is closed after PR #494, and #489 Phase 64 exit gate closed by PR #494. The closed queue records milestone Phase 65 - Selected-World Deterministic Runtime Generation Evidence Gate is closed, #495 Phase 65 exit gate closed by PR #500, #496 Phase 65: sync repo truth after Phase 64 closeout and define selected-world runtime-generation evidence gate closed by PR #498, and #497 Phase 65: add selected-world deterministic runtime generation smoke closed by PR #499. audit-github-queue reports paused with no active milestone after Phase 65 closeout. The Phase 65 gate lives in docs/plans/phase-65-selected-world-deterministic-runtime-generation-gate-2026-06-01.md and covers selected-world deterministic runtime generation evidence through existing v1 CLI/session contracts with temporary local artifacts only. The Phase 65 runtime evidence note lives in docs/plans/phase-65-selected-world-runtime-generation-evidence-2026-06-01.md and is reproduced by scripts/smoke_phase65_selected_world_runtime_generation.py.

Phase 66 is closed as Phase 66 - Selected-World Generated Runtime Surface Continuity Gate. milestone Phase 66 - Selected-World Generated Runtime Surface Continuity Gate is closed, #501 Phase 66 exit gate closed by PR #506, #502 Phase 66: sync repo truth after Phase 65 closeout and define selected-world generated-runtime surface continuity gate closed by PR #504, and #503 Phase 66: add selected-world generated runtime surface continuity smoke closed by PR #505. audit-github-queue reports paused with no active milestone after Phase 66 closeout. The Phase 66 gate lives in docs/plans/phase-66-selected-world-generated-runtime-surface-continuity-gate-2026-06-04.md and covers selected bounded fictional or explicitly authorized worlds and selected-world generated runtime surface continuity only: generated session/node artifacts for fog-harbor-east-gate, museum-night, and library-rain must be checked against existing world-scoped runtime, explain, report, and review surfaces through existing v1 CLI/session contracts with temporary local artifacts. TODO[verify]: Phase 66 generated-runtime surface continuity is inferred from Phase 65 evidence and existing world-scoped runtime/review/report routes; no tracked pre-Phase-66 doc currently names this scope. Phase 67 must start with a blueprint-calibration successor boundary before any additional surface/readiness/gate evidence is promoted. The next phase must state how it improves corpus -> chunks -> graph -> personas -> scenarios -> deterministic runs -> report/claims -> eval.

Phase 66 selected-world generated runtime surface continuity evidence for #503 Phase 66: add selected-world generated runtime surface continuity smoke lives in docs/plans/phase-66-selected-world-generated-runtime-surface-continuity-evidence-2026-06-04.md and is reproduced by scripts/smoke_phase66_selected_world_runtime_surface_continuity.py; it checks existing world-scoped runtime, explain, report, and review surfaces with temporary local artifacts.

Phase 66 closeout shorthand: #501 Phase 66 exit gate closed by PR #506; #502 closed by PR #504; #503 closed by PR #505.

Phase 67 closeout decision is recorded by PR #514. Post-merge stop-state: Phase 67 is closed as Phase 67 - Blueprint Calibration and Minimum-Loop Value Gate. milestone Phase 67 - Blueprint Calibration and Minimum-Loop Value Gate is closed, #507 Phase 67 exit gate closed by PR #514, #508 closed by PR #510, #509 closed by PR #512, and #511 Phase 67: align report and claims generation with compare-sourced branch truth closed by PR #513. audit-github-queue reports paused with no active milestone after Phase 67 closeout. The Phase 67 closeout note lives in docs/plans/phase-67-blueprint-calibration-minimum-loop-closeout-2026-06-08.md; the Phase 67 gate lives in docs/plans/phase-67-blueprint-calibration-minimum-loop-gate-2026-06-04.md; the minimum-loop value gap audit lives in docs/plans/phase-67-minimum-loop-value-gap-audit-2026-06-04.md. Phase 67 completed the source-backed compare-sourced report/claims closure selected by the audit over corpus -> chunks -> graph -> personas -> scenarios -> deterministic runs -> report/claims -> eval, and it tied the work to scenario/intervention/branch-comparison/eval value. No Phase 68 successor queue is opened in this closeout. Every future successor must identify a new source-backed minimum-loop gap or protected-core contract blocker before opening. Do not open another adjacent surface/readiness/fidelity/continuity gate as the primary successor scope without a source-backed tie to scenario/intervention/branch-comparison/eval value. Pre-Merge Evidence Boundary: Before PR #514 merges and the Phase 67 milestone is closed, live GitHub still reports #507 open and Phase 67 - Blueprint Calibration and Minimum-Loop Value Gate as the active milestone; this closeout PR records the required post-merge verification target.

Phase 67 closeout shorthand: #507 Phase 67 exit gate closed by PR #514; #508 closed by PR #510; #509 closed by PR #512; #511 closed by PR #513.

Post-Phase-67 successor intake audit keeps the queue paused; docs/plans/post-phase-67-successor-intake-audit-2026-06-08.md records the successor-intake decision. No Phase 68 successor queue is opened by this audit. Do not open Phase 68 as an execution queue until this intake audit identifies a new source-backed minimum-loop gap or protected-core contract blocker. The intake remains tied to corpus -> chunks -> graph -> personas -> scenarios -> deterministic runs -> report/claims -> eval.

Post-Phase-67 outcome/report/eval generalization audit keeps the queue paused; docs/plans/post-phase-67-outcome-report-eval-generalization-audit-2026-06-08.md records that selected-world proof is current for fog-harbor-east-gate, museum-night, and library-rain, does not claim future-world readiness, and does not prove a Phase 68 blocker. Do not open Phase 68 from this audit.

Post-Phase-67 runtime-created world eval proof keeps the queue paused; docs/plans/post-phase-67-runtime-created-world-eval-proof-2026-06-08.md records that a runtime-created bounded world can pass eval-world, does not claim future-world readiness, and does not prove a Phase 68 blocker. Do not open Phase 68 from this proof.

Post-Phase-67 decision-trace replay audit keeps the queue paused; docs/plans/post-phase-67-decision-trace-replay-audit-2026-06-08.md records current evidence for kernel-level replay and runner-level same-run-directory replay. Do not open Phase 68 from this audit.

Post-Phase-67 decision-trace eval-ownership boundary keeps the queue paused; docs/plans/post-phase-67-decision-trace-eval-ownership-boundary-2026-06-08.md records that eval-owned decision-trace replay metrics remain unclaimed and that opening implementation without a source-backed blocker would be blueprint drift. Do not open Phase 68 from this boundary note.

Snapshot

  • Local quality baseline:
    • ./make.ps1 smoke
    • ./make.ps1 test
    • ./make.ps1 eval-demo
    • python -m backend.app.cli audit-phase phase1
    • python -m backend.app.cli audit-phase phase2
    • python -m backend.app.cli audit-phase phase3
  • GitHub source-of-truth baseline:
    • gh api repos/YSCJRH/mirror-sim
      • default_branch: main
      • license: MIT
    • gh api repos/YSCJRH/mirror-sim/issues/4
      • Phase 3 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/3
      • milestone Phase 3 - Eval/UI/Demo is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/4
      • milestone Phase 4 - Review Workflow and Ops Hardening is closed
    • gh api repos/YSCJRH/mirror-sim/issues/26
      • Phase 4 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/5
      • milestone Phase 5 - Review Sign-off and Evidence Packaging is closed
    • gh api repos/YSCJRH/mirror-sim/issues/31
      • Phase 5 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/6
      • milestone Phase 6 - Automation Activation and Queue Hygiene is closed
    • gh api repos/YSCJRH/mirror-sim/issues/40
      • Phase 6 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/7
      • milestone Phase 7 - Operator Handoff and Review Delivery is closed
    • gh api repos/YSCJRH/mirror-sim/issues/46
      • Phase 7 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/8
      • milestone Phase 8 - Closeout Delivery and Pickup Routing is closed
    • gh api repos/YSCJRH/mirror-sim/issues/53
      • Phase 8 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/9
      • milestone Phase 9 - Review Delivery Polish and Completeness is closed
    • gh api repos/YSCJRH/mirror-sim/issues/60
      • Phase 9 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/10
      • milestone Phase 10 - Guided Delivery and Quick Export is closed
    • gh api repos/YSCJRH/mirror-sim/issues/67
      • Phase 10 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/11
      • milestone Phase 11 - Export Presets and Delivery Shortcuts is closed
    • gh api repos/YSCJRH/mirror-sim/issues/74
      • Phase 11 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/12
      • milestone Phase 12 - Delivery Preset Refinement and Comparison Flow is closed
    • gh api repos/YSCJRH/mirror-sim/issues/81
      • Phase 12 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/13
      • milestone Phase 13 - Guided Export Payload Review is closed
    • gh api repos/YSCJRH/mirror-sim/issues/88
      • Phase 13 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/14
      • milestone Phase 14 - Export Delta and Copy Confidence is closed
    • gh api repos/YSCJRH/mirror-sim/issues/95
      • Phase 14 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/15
      • milestone Phase 15 - Override Rationale and Delivery Confidence is closed
    • gh api repos/YSCJRH/mirror-sim/issues/102
      • Phase 15 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/16
      • milestone Phase 16 - Export Bundle Composition and Handoff Packaging is closed
    • gh api repos/YSCJRH/mirror-sim/issues/109
      • Phase 16 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/17
      • milestone Phase 17 - Final Bundle Delivery and Handoff Manifest is closed
    • gh api repos/YSCJRH/mirror-sim/issues/116
      • Phase 17 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/18
      • milestone Phase 18 - Bundle Variants and Receiver Guidance is closed
    • gh api repos/YSCJRH/mirror-sim/issues/123
      • Phase 18 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/19
      • milestone Phase 19 - Receiver Roles and Follow-Through Routing is closed
    • gh api repos/YSCJRH/mirror-sim/issues/130
      • Phase 19 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/20
      • milestone Phase 20 - Role-Specific Bundle Layout and Decision Templates is closed
    • gh api repos/YSCJRH/mirror-sim/issues/137
      • Phase 20 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/21
      • milestone Phase 21 - Role Presets and Response Packaging is closed
    • gh api repos/YSCJRH/mirror-sim/issues/144
      • Phase 21 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/22
      • milestone Phase 22 - Preset Workflow and Packed Responses is closed
    • gh api repos/YSCJRH/mirror-sim/issues/151
      • Phase 22 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/23
      • milestone Phase 23 - Preset Sessions and Response Kits is closed
    • gh api repos/YSCJRH/mirror-sim/issues/158
      • Phase 23 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/24
      • milestone Phase 24 - Session Handoff and Route Comparison is closed
    • gh api repos/YSCJRH/mirror-sim/issues/165
      • Phase 24 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/25
      • milestone Phase 25 - Handoff Delivery and Packet Variants is closed
    • gh api repos/YSCJRH/mirror-sim/issues/172
      • Phase 25 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/26
      • milestone Phase 26 - Packet Delivery Prep and Sender Notes is closed
    • gh api repos/YSCJRH/mirror-sim/issues/179
      • Phase 26 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/27
      • milestone Phase 27 - Sendoff Summary and Packet Recommendation is closed
    • gh api repos/YSCJRH/mirror-sim/issues/186
      • Phase 27 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/28
      • milestone Phase 28 - Send Decision and Delivery Checklist is closed
    • gh api repos/YSCJRH/mirror-sim/issues/193
      • Phase 28 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/29
      • milestone Phase 29 - Delivery Bundle and Follow-up Pack is closed
    • gh api repos/YSCJRH/mirror-sim/issues/204
      • Phase 29 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/30
      • milestone Phase 30 - Delivery Confirmation and Receiver Response is closed
    • gh api repos/YSCJRH/mirror-sim/issues/211
      • Phase 30 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/31
      • milestone Phase 31 - Reply Outcome and Resolution Handoff is closed
    • gh api repos/YSCJRH/mirror-sim/issues/218
      • Phase 31 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/32
      • milestone Phase 32 - Resolution Status and Next-Step Routing is closed
    • gh api repos/YSCJRH/mirror-sim/issues/225
      • Phase 32 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/33
      • milestone Phase 33 - Action Readiness and Escalation Packet is closed
    • gh api repos/YSCJRH/mirror-sim/issues/234
      • Phase 33 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/issues/239
      • Phase 34 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/34
      • milestone Phase 34 - Execution Kickoff and Escalation Decision is closed
    • gh api repos/YSCJRH/mirror-sim/issues/246
      • Phase 35 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/35
      • milestone Phase 35 - Execution Tracking and Escalation Trigger is closed
    • gh api repos/YSCJRH/mirror-sim/issues/253
      • Phase 36 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/36
      • milestone Phase 36 - Execution Outcome and Escalation Dispatch is closed
    • gh api repos/YSCJRH/mirror-sim/issues/260
      • Phase 37 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/37
      • milestone Phase 37 - Execution Correction and Escalation Delivery is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/38
      • milestone Phase 38 - Execution Recovery and Escalation Confirmation is closed
    • gh api repos/YSCJRH/mirror-sim/issues/267
      • Phase 38 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/39
      • milestone Phase 39 - Recovery Checkpoint and Escalation Receipt is closed
    • gh api repos/YSCJRH/mirror-sim/issues/274
      • Phase 39 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/40
      • milestone Phase 40 - Recovery Clearance and Escalation Acknowledgment is closed
    • gh api repos/YSCJRH/mirror-sim/issues/281
      • Phase 40 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/41
      • milestone Phase 41 - Recovery Release and Escalation Closure is closed
    • gh api repos/YSCJRH/mirror-sim/issues/288
      • Phase 41 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/42
      • milestone Phase 42 - Recovery Completion and Escalation Finalization is closed
    • gh api repos/YSCJRH/mirror-sim/issues/295
      • Phase 42 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/43
      • milestone Phase 43 - Successor Bootstrap and Branch Exception Resolution is closed
    • gh api repos/YSCJRH/mirror-sim/issues/306
      • Phase 43 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/milestones/44
      • milestone Phase 44 - Counterfactual Depth and Eval Hardening is closed
    • gh api repos/YSCJRH/mirror-sim/issues/313
      • Phase 44 exit issue is closed
    • gh api repos/YSCJRH/mirror-sim/issues/314
      • Phase 44 queue-sync issue is closed after merging PR #317
    • gh api repos/YSCJRH/mirror-sim/issues/315
      • Phase 44 scenario-matrix issue is closed after merging PR #319
    • gh api repos/YSCJRH/mirror-sim/issues/316
      • Phase 44 comparison-overview issue is closed after merging PR #321
    • gh api repos/YSCJRH/mirror-sim/milestones/45
      • milestone Phase 45 - Branch Generalization and Compare Contracts is closed
    • gh api repos/YSCJRH/mirror-sim/issues/322
      • Phase 45 exit issue is closed after the Phase 46 successor handoff
    • gh api repos/YSCJRH/mirror-sim/issues/323
      • Phase 45 queue-sync issue is closed after merging PR #327
    • gh api repos/YSCJRH/mirror-sim/issues/324
      • Phase 45 ADR/contracts issue is closed after merging PR #329
    • gh api repos/YSCJRH/mirror-sim/issues/325
      • Phase 45 runner/artifact issue is closed after merging PR #331
    • gh api repos/YSCJRH/mirror-sim/issues/326
      • Phase 45 focused diff-surface issue is closed after merging PR #333
    • gh api repos/YSCJRH/mirror-sim/milestones/46
      • milestone Phase 46 - Workbench Focus and Modularity is closed after the formal closeout
    • gh api "repos/YSCJRH/mirror-sim/milestones?state=open"
      • no open milestone remains after the Phase 46 closeout
    • gh issue list --milestone "Phase 46 - Workbench Focus and Modularity" --state all
      • Phase 46 exit gate is closed after the formal closeout
      • Phase 46: sync repo truth to Phase 46 queue is closed after the successor bootstrap PR merges
      • Phase 46: extract review-scorecard into modular feature slices is closed after merging PR #340
      • Phase 46: define the default operator path around compare-evidence-eval is closed after merging PR #342
      • Phase 46: move secondary packet surfaces behind advanced navigation is closed after merging PR #344
    • gh api repos/YSCJRH/mirror-sim/releases
      • release v0.1.0 exists and matches the committed release notes baseline
    • python -m backend.app.cli audit-github-queue --repo YSCJRH/mirror-sim
      • queue reports paused with no active milestone
    • gh issue list --milestone "Phase 47 - Boundary Readiness and Successor Hygiene" --state all
      • #365 Phase 47 exit gate is closed after merging PR #374
      • #366 Phase 47: sync repo truth to successor queue is closed after merging PR #370
      • #367 Phase 47: public/private/plugin boundary regression is closed after merging PR #371
      • #368 Phase 47: runtime world safety preflight is closed after merging PR #372
      • #369 Phase 47: main-path product containment is closed after merging PR #373
    • gh issue list --milestone "Phase 48 - Successor Intake and Boundary Contract Triage" --state all
      • #375 Phase 48 exit gate is closed after PR #382 merged and the post-merge reassessment passed
      • #376 Phase 48: sync repo truth after Phase 47 closeout is closed
      • #377 Phase 48: public private plugin boundary acceptance is closed and recorded in docs/plans/phase-48-boundary-acceptance-2026-05-17.md
      • #378 Phase 48: private beta runtime contract audit is closed by PR #382 and recorded in docs/plans/phase-48-private-beta-runtime-contract-audit-2026-05-18.md
      • #379 Phase 48: kernel perturbation gap brief is closed by PR #382 and recorded in docs/plans/phase-48-kernel-perturbation-gap-brief-2026-05-18.md
    • gh api repos/YSCJRH/mirror-sim/milestones/48
      • milestone Phase 48 - Successor Intake and Boundary Contract Triage is closed
    • gh issue list --milestone "Phase 49 - Kernel, Perturbation, and Runtime Contract Hardening" --state all
      • #383 Phase 49 exit gate is closed after the Phase 49 closeout reassessment
      • #384 Phase 49: sync repo truth and protect runtime core lanes is closed by PR #385
      • #386 Phase 49: ratify kernel trace and replay contract is closed by PR #387
      • #388 Phase 49: ratify perturbation schema and resolver authoring contract is closed by PR #389
      • #390 Phase 49: ratify runtime parent-child compare emission policy is closed by PR #391
      • #392 Phase 49: ratify runtime latest-activity metadata and rollback scope is closed by PR #393
      • #394 Phase 49: strengthen transfer eval outcome coverage is closed by PR #395
    • gh api repos/YSCJRH/mirror-sim/milestones/49
      • milestone Phase 49 - Kernel, Perturbation, and Runtime Contract Hardening is closed
    • gh issue list --milestone "Phase 50 - Runtime Orchestration Measurement and Product Boundary" --state all
      • #396 Phase 50 exit gate is closed after the Phase 50 closeout reassessment
      • #397 Phase 50: sync repo truth after Phase 49 closeout is closed by PR #399
      • #398 Phase 50: measure runtime generation duration before task_id decision is closed by PR #400
      • #401 Phase 50: ratify private-beta launch hub and public-path boundary is closed by PR #402
    • gh api repos/YSCJRH/mirror-sim/milestones/50
      • milestone Phase 50 - Runtime Orchestration Measurement and Product Boundary is closed
    • Phase 50 Product Boundary Decision:
      • launch hub remains planning-only for now
      • / remains the guided public demo
      • docs/plans/phase-50-product-boundary-2026-05-18.md records the boundary note
    • gh issue list --milestone "Phase 51 - Private-Beta Route Contract and Runtime Readiness Gate" --state all
      • #403 Phase 51 exit gate is closed after the Phase 51 closeout reassessment
      • #404 Phase 51: sync repo truth after Phase 50 closeout is closed by PR #407
      • #405 Phase 51: ratify private-beta route ownership and launch-hub contract is closed by PR #408
      • #406 Phase 51: verify runtime readiness thresholds and world-scoped session guards is closed by PR #409
    • gh api repos/YSCJRH/mirror-sim/milestones/51
      • milestone Phase 51 - Private-Beta Route Contract and Runtime Readiness Gate is closed
    • Phase 51 Private-Beta Route Ownership Contract:
      • private-beta launch hub remains planning-only
      • / and /review remain public-demo surfaces
      • /worlds/<world_id> remains the private-beta candidate product path
      • docs/plans/phase-51-private-beta-route-contract-2026-05-18.md records the route contract note
      • docs/architecture/contracts.md and docs/decisions/ADR-0011-private-beta-route-ownership.md record the durable route ownership contract
    • Phase 51 Runtime Readiness and World-Scoped Guard Verification:
      • synchronous v1 generation remains the current runtime contract
      • private-beta runtime mutations pass route-derived world scope through composer, CLI, and backend service guards
      • world-scoped workspace loading rejects session or node manifests whose durable world/session ids conflict with route params
      • docs/plans/phase-51-runtime-readiness-guards-2026-05-18.md records the guard verification note
    • gh issue list --milestone "Phase 52 - Legacy Route Containment and Runtime Scope Audit" --state all
      • #410 Phase 52 exit gate is closed after post-merge validation on main
      • #411 Phase 52: sync repo truth after Phase 51 closeout and define successor gate is closed by PR #414
      • #412 Phase 52: audit legacy top-level runtime routes and preserve boundary contract is closed by PR #415
      • #413 Phase 52: strengthen runtime mutation guard regression baseline is closed by PR #416
    • gh api repos/YSCJRH/mirror-sim/milestones/52
      • milestone Phase 52 - Legacy Route Containment and Runtime Scope Audit is closed
    • Phase 52 successor gate:
      • Phase 52 Legacy Top-Level Runtime Route Audit is the completed protected route-containment audit surface
      • docs/plans/phase-52-legacy-runtime-route-audit-2026-05-18.md records the route audit note
      • Phase 52 Runtime Mutation Guard Regression Baseline is the completed protected guard-regression surface
      • docs/plans/phase-52-runtime-mutation-guard-regression-2026-05-18.md records the runtime guard note
      • legacy top-level runtime routes remain explicitly contained
      • runtime mutation guard regression coverage keeps route-derived worldId and public-demo blocking in scope
      • docs/plans/phase-52-successor-gate-2026-05-18.md records the completed gate note
    • gh issue list --milestone "Phase 53 - Transfer Generalization and Third-World Readiness" --state all
      • #418 Phase 53 exit gate is closed after post-merge validation
      • #419 Phase 53: sync repo truth after Phase 52 closeout and define transfer gate is closed by PR #422
      • #420 Phase 53: audit transfer assumptions and third-world readiness constraints is closed by PR #423
      • #421 Phase 53: add bounded third-world transfer readiness evidence is closed by PR #424
    • Phase 53 Successor Gate:
      • Phase 53 - Transfer Generalization and Third-World Readiness is closed
      • docs/plans/phase-53-successor-gate-2026-05-19.md records the completed gate note
      • docs/plans/phase-53-transfer-assumption-audit-2026-05-19.md records the completed transfer assumption audit
      • docs/plans/phase-53-third-world-transfer-evidence-2026-05-19.md records the completed library-rain third-world evidence slice
      • Phase 53 strengthened bounded transfer generalization and third-world readiness evidence
      • public demo, plugin, Hosted GPT/BYOK, launch hub, async, and runtime mutation boundaries remain unchanged
    • gh issue list --milestone "Phase 54 - Runtime Orchestration Measurement and Async Contract Decision Gate" --state all
      • #426 Phase 54 exit gate is closed after post-merge validation
      • #427 Phase 54: sync repo truth after Phase 53 closeout and define runtime gate is closed by PR #429
      • #428 Phase 54: refresh runtime measurement and decide async contract boundary is closed by PR #430 and records the Phase 54 Runtime Measurement and Async Contract Decision
    • gh api repos/YSCJRH/mirror-sim/milestones/54
      • milestone Phase 54 - Runtime Orchestration Measurement and Async Contract Decision Gate is closed
    • Phase 54 Successor Gate:
      • docs/plans/phase-54-successor-gate-2026-05-19.md records the completed gate note
      • docs/plans/phase-54-runtime-measurement-async-contract-decision-2026-05-19.md records the Phase 54 Runtime Measurement and Async Contract Decision
      • audit-github-queue reported paused in the formal paused stop-state until Phase 55 opened
      • Phase 54 covered runtime measurement and async contract decision work
      • Keep synchronous generation for v1. Defer async task contract ratification.
      • public demo, plugin, Hosted GPT/BYOK, launch hub, async implementation, and runtime mutation boundaries remain unchanged
    • gh issue list --milestone "Phase 55 - Analysis-First Main Path and Review Surface Guardrails" --state all
      • #432 Phase 55 exit gate is closed after post-merge validation
      • #433 Phase 55: sync repo truth after Phase 54 closeout and define main-path gate is closed by PR #436
      • #434 Phase 55: audit candidate product-reframe plans and freeze contract-safe scope is closed by PR #437
      • #435 Phase 55: add analysis-first review-surface regression guardrail is closed by PR #438
    • gh api repos/YSCJRH/mirror-sim/milestones/55
      • milestone Phase 55 - Analysis-First Main Path and Review Surface Guardrails is closed
    • Phase 55 Successor Gate:
      • docs/plans/phase-55-successor-gate-2026-05-20.md records the completed gate note
      • audit-github-queue reports paused after the Phase 55 closeout
      • Phase 55 covered candidate planning audit and analysis-first review-surface guardrails
      • Keep synchronous generation for v1. Defer async task contract ratification.
      • public demo, plugin, Hosted GPT/BYOK, launch hub, async implementation, and runtime mutation boundaries remain unchanged
    • gh issue list --milestone "Phase 56 - Source-Verified Candidate Promotion and Review Continuity" --state all
      • #440 Phase 56 exit gate is closed by PR #447 after post-merge validation
      • #441 Phase 56: sync repo truth after Phase 55 closeout and define source-verified gate closed by PR #444
      • #442 Phase 56: source-verify candidate planning signals against current frontend closed by PR #445
      • #443 Phase 56: add world-scoped review continuity guardrail closed by PR #446
    • gh api repos/YSCJRH/mirror-sim/milestones/56
      • milestone Phase 56 - Source-Verified Candidate Promotion and Review Continuity is closed
    • Phase 56 Successor Gate:
      • docs/plans/phase-56-successor-gate-2026-05-20.md records the closeout note
      • after milestone 56 closed, audit-github-queue reports paused with active_milestone: null
      • Phase 56 covers source-verified candidate promotion and review-continuity guardrails
      • Keep synchronous generation for v1. Defer async task contract ratification.
      • public demo, plugin, Hosted GPT/BYOK, launch hub, async implementation, and runtime mutation boundaries remain unchanged
    • gh issue list --milestone "Phase 57 - Post-Phase-56 Repo Truth Sync and Successor Boundary" --state all
      • #448 Phase 57 exit gate closed by PR #451
      • #449 Phase 57: sync repo truth after Phase 56 closeout and define successor boundary closed by PR #450
    • gh issue list --milestone "Phase 58 - Private-Beta Route Readiness Evidence Gate" --state all
      • #453 Phase 58 exit gate closed by PR #458
      • #454 Phase 58: sync repo truth after PR #452 and define route-readiness evidence gate closed by PR #456
      • #455 Phase 58: reproduce private-beta route-readiness snapshots with tracked smoke coverage closed by PR #457; tracked snapshot evidence lives in docs/plans/phase-58-route-readiness-snapshot-evidence-2026-05-20.md
    • python -m backend.app.cli audit-github-queue --repo YSCJRH/mirror-sim
      • audit-github-queue reports paused with no active milestone
    • gh issue list --milestone "Phase 59 - Selected-World Route Continuity Evidence Gate" --state all
      • #459 Phase 59 exit gate closed by PR #464
      • #460 Phase 59: sync repo truth after Phase 58 closeout and define selected-world route gate closed by PR #462
      • #461 Phase 59: add GET-only selected-world route smoke for Fog Harbor, Museum Night, and Library Rain closed by PR #463
    • gh api repos/YSCJRH/mirror-sim/milestones/59
      • milestone Phase 59 - Selected-World Route Continuity Evidence Gate is closed
    • gh issue list --milestone "Phase 60 - Selected-World Review Artifact Integrity Gate" --state all
      • #465 Phase 60 exit gate is closed by PR #470
      • #466 Phase 60: sync repo truth after Phase 59 closeout and define artifact integrity gate is closed by PR #468
      • #467 Phase 60: add selected-world review artifact integrity smoke is closed by PR #469
    • gh api repos/YSCJRH/mirror-sim/milestones/60
      • milestone Phase 60 - Selected-World Review Artifact Integrity Gate is closed
    • python -m backend.app.cli audit-github-queue --repo YSCJRH/mirror-sim
      • before Phase 61 opened, audit-github-queue reported paused with no active milestone
    • gh issue list --milestone "Phase 61 - Selected-World Review Surface Evidence Binding Gate" --state all
      • #471 Phase 61 exit gate closed by the Phase 61 closeout PR
      • #472 Phase 61: sync repo truth after Phase 60 closeout and define review surface evidence gate closed by PR #474
      • #473 Phase 61: add selected-world review surface evidence binding smoke closed by PR #475
    • python -m backend.app.cli audit-github-queue --repo YSCJRH/mirror-sim
      • audit-github-queue reports paused with no active milestone

Trusted Source Of Truth

  • GitHub issue and milestone state remain the operational source of truth for current and future work.
  • Local phase audits remain the contract-aligned source of truth for whether the current repo state is runnable and reviewable.
  • audit-github-queue is the executable local rule for whether builder automation should remain paused, has entered the released stop-state, or can resume against the active successor queue.
  • backlog/sprint-01.md is historical seed material only and should not be used as the live queue.
  • Historical remote origin/codex/* branches have now been reduced to zero live legacy exceptions and should not be treated as a standing backlog.
  • The current reviewed branch-hygiene baseline lives in docs/plans/codex-branch-classification-baseline.md and records the closed #308 evidence that reduced live historical origin/codex/* branches to zero.
  • Any future local origin/codex/* tracking ref that survives after a verified remote deletion should be treated as stale fetch residue and pruned against live GitHub truth.
  • Delete a historical remote branch once it is tied only to merged or closed work and no open issue, PR, or runbook step still references it.
  • Keep a historical remote branch only when an open issue or unresolved forensic comparison explicitly names it.
  • Revive a historical remote branch only by opening a new issue that states why main is insufficient.

Current Main Capabilities

  • The backend can ingest corpus documents, build a graph, build personas, validate scenarios, simulate deterministic runs, generate reports, inspect world objects, and run evals.
  • The simulation runner now also supports deterministic multi-branch execution under the ratified branch_count contract and emits durable compare artifacts for the canonical scenario matrix.
  • The frontend workbench renders report, claims, eval summary, rubric, corpus, graph, and scenario artifacts directly from the repo artifact tree.
  • The default workbench path now consumes the canonical compare artifact directly and keeps focused divergent trace surfaces ahead of heavier packet-driven review flows.
  • The workbench now also supports claim -> evidence drill-down, baseline/intervention trace review, reviewer scorecards, shareable review packet export, issue-comment handoff copy, operator decision briefs, exit-gate closeout packets, lane-aware pickup routing, export destination guidance, delivery-readiness warnings, destination-aware recommendations, packet coverage previews, delivery presets, preset comparison cards, carry-forward chips, quick-export shortcuts, payload previews, tradeoff-guidance cards, diff highlights, copy-preflight checklists, override-rationale cues, copy-sidecar summaries, composed handoff-bundle previews, destination-specific attachment-order guidance, recipient-facing cover sheets, one-step final bundle copies with package manifests, compact-versus-full bundle variants, receiver follow-through cues, receiver-role modes, routing-strip follow-through guidance, role-specific bundle emphasis, decision-template snippets, role preset cards, response-packaging shortcuts, apply-and-copy preset actions, grouped response-pack export, active preset session summary strips, route-filtered response kit choosers, route-kit comparison cards, preset session handoff packets, send-readiness cue strips, compact-versus-full handoff packet variants, destination-specific sender notes, compact-versus-full handoff packet diff previews, final send summary cards, destination-aware packet recommendation banners, delivery-bundle exports, receiver follow-up packs, delivery checkpoint boards, receiver response packets, reply outcome trackers, resolution handoff packs, resolution status boards, next-step routing packs, action readiness boards, escalation handoff packets, execution kickoff boards, execution progress trackers, execution outcome boards, execution correction boards, execution recovery boards, execution recovery checkpoint boards, execution recovery clearance boards, execution recovery release boards, escalation decision guides, escalation trigger packets, escalation dispatch packets, escalation delivery packets, escalation confirmation packets, escalation receipt packets, escalation acknowledgment packets, and escalation closure packets without introducing backend API expansion.
  • The active repository state has Phase 53 transfer-generalization closeout complete, Phase 54 closeout complete, Phase 55 closeout complete, Phase 56 closed, Phase 57 closed after PR #451, Phase 58 closed after PR #458, Phase 59 closed after selected-world route continuity evidence, Phase 60 closed after selected-world review artifact integrity evidence, Phase 61 closed after selected-world review surface evidence binding, Phase 62 closed after selected-world review evidence actionability, Phase 63 closed after selected-world review next-action route fidelity, Phase 64 closed after PR #494, Phase 65 is closed as Phase 65 - Selected-World Deterministic Runtime Generation Evidence Gate, Phase 66 is closed as Phase 66 - Selected-World Generated Runtime Surface Continuity Gate, and Phase 67 closeout decision is recorded by PR #514. Post-merge stop-state: Phase 67 is closed as Phase 67 - Blueprint Calibration and Minimum-Loop Value Gate; selected-world deterministic runtime generation evidence reproduced through existing v1 CLI/session contracts, selected-world generated runtime surface continuity evidence reproduced through existing world-scoped surfaces, Phase 67 completed compare-sourced report/claims closure through #511 Phase 67: align report and claims generation with compare-sourced branch truth closed by PR #513 as the selected scenario/intervention/branch-comparison/eval value item for corpus -> chunks -> graph -> personas -> scenarios -> deterministic runs -> report/claims -> eval, v0.1.0 preserved as the latest published release baseline, and public demo, plugin, Hosted GPT/BYOK, launch hub, async implementation, and runtime mutation boundaries unchanged. Pre-Merge Evidence Boundary: Before PR #514 merges and the Phase 67 milestone is closed, live GitHub still reports #507 open and Phase 67 - Blueprint Calibration and Minimum-Loop Value Gate as the active milestone; this closeout PR records the required post-merge verification target.
  • The Phase 60 Selected-World Review Artifact Integrity Gate lives in docs/plans/phase-60-selected-world-artifact-integrity-gate-2026-05-23.md.
  • The Phase 60 Selected-World Review Artifact Integrity Evidence lives in docs/plans/phase-60-selected-world-artifact-integrity-evidence-2026-05-23.md and is reproduced by scripts/smoke_phase60_selected_world_artifact_integrity.py.
  • The Phase 61 selected-world review surface evidence binding note lives in docs/plans/phase-61-selected-world-review-surface-evidence-binding-2026-05-23.md and is reproduced by scripts/smoke_phase61_selected_world_review_surface_binding.py.
  • The Phase 62 selected-world review evidence actionability gate lives in docs/plans/phase-62-selected-world-review-evidence-actionability-gate-2026-05-25.md.
  • The Phase 62 selected-world review evidence actionability note lives in docs/plans/phase-62-selected-world-review-evidence-actionability-2026-05-25.md and is reproduced by scripts/smoke_phase62_selected_world_review_actionability.py.

Next Entry Point

  • Phase 51 is closed after PR #409, issue #403, and milestone Phase 51 - Private-Beta Route Contract and Runtime Readiness Gate.
  • Phase 52 is closed after PR #416, issue #410, and milestone Phase 52 - Legacy Route Containment and Runtime Scope Audit; before Phase 53 was opened, audit-github-queue reported the formal paused stop-state.
  • Phase 53 is closed after PR #424, issue #418, and milestone Phase 53 - Transfer Generalization and Third-World Readiness; after closeout, the queue returned to the formal paused stop-state until Phase 54 was opened.
  • Phase 54 is closed after PR #430, issue #426, and milestone Phase 54 - Runtime Orchestration Measurement and Async Contract Decision Gate; audit-github-queue reported paused in the formal paused stop-state until Phase 55 opened.
  • Phase 55 is closed after PR #438, issue #432, and milestone Phase 55 - Analysis-First Main Path and Review Surface Guardrails; #433 closed by PR #436, #434 closed by PR #437, and #435 closed by PR #438. Immediately after closeout and before Phase 56 opened, audit-github-queue reported paused in the formal paused stop-state.
  • Phase 56 is closed after PR #447, issue #440, and milestone Phase 56 - Source-Verified Candidate Promotion and Review Continuity; #441 closed by PR #444, #442 closed by PR #445, and #443 closed by PR #446. After milestone 56 closed, audit-github-queue reports paused with active_milestone: null.
  • The Phase 47 unlock order is resolved: the queue-sync issue is closed after PR #370, the boundary-regression report is closed after PR #371, the runtime-world safety preflight is closed after PR #372, the main-path containment report is closed after PR #373, and the exit gate is closed after PR #374.
  • The Phase 48 unlock order is resolved: #376 and #377 closed through earlier Phase 48 PRs, #378 and #379 closed through PR #382, and #375 closed after the post-merge exit-gate reassessment.
  • The Phase 49 unlock order is resolved: #384 closed through PR #385, #386 closed through PR #387, #388 closed through PR #389, #390 closed through PR #391, #392 closed through PR #393, #394 closed through PR #395, and #383 closed after the post-merge exit-gate reassessment.
  • The Phase 50 unlock order is resolved: #397 closed through PR #399, #398 closed through PR #400, #401 closed through PR #402, and #396 closed after the post-merge exit-gate reassessment.
  • Phase 57 is closed after PR #451; #448 closed by PR #451, #449 closed by PR #450, milestone Phase 57 - Post-Phase-56 Repo Truth Sync and Successor Boundary is closed, and audit-github-queue reports paused with no active milestone.
  • Phase 58 is closed after PR #458; #453 Phase 58 exit gate closed by PR #458, #454 Phase 58: sync repo truth after PR #452 and define route-readiness evidence gate closed by PR #456, #455 Phase 58: reproduce private-beta route-readiness snapshots with tracked smoke coverage closed by PR #457, milestone Phase 58 - Private-Beta Route Readiness Evidence Gate is closed, and audit-github-queue reports paused with no active milestone. The Phase 58 Route Readiness Evidence Gate lives in docs/plans/phase-58-route-readiness-evidence-gate-2026-05-20.md; the Phase 58 Route Readiness Snapshot Evidence lives in docs/plans/phase-58-route-readiness-snapshot-evidence-2026-05-20.md.
  • Phase 59 is closed; #459 Phase 59 exit gate closed by PR #464, #460 Phase 59: sync repo truth after Phase 58 closeout and define selected-world route gate closed by PR #462, #461 Phase 59: add GET-only selected-world route smoke for Fog Harbor, Museum Night, and Library Rain closed by PR #463, milestone Phase 59 - Selected-World Route Continuity Evidence Gate is closed, and audit-github-queue reports paused with no active milestone. The Phase 59 Selected-World Route Continuity Gate lives in docs/plans/phase-59-selected-world-route-continuity-gate-2026-05-23.md.
  • The Phase 59 Selected-World Route Evidence lives in docs/plans/phase-59-selected-world-route-evidence-2026-05-23.md.
  • Phase 60 is closed; milestone Phase 60 - Selected-World Review Artifact Integrity Gate is closed, #465 Phase 60 exit gate closed by PR #470, #466 Phase 60: sync repo truth after Phase 59 closeout and define artifact integrity gate closed by PR #468, #467 Phase 60: add selected-world review artifact integrity smoke closed by PR #469, and before Phase 61 opened audit-github-queue reported paused with no active milestone. The Phase 60 gate lives in docs/plans/phase-60-selected-world-artifact-integrity-gate-2026-05-23.md; the selected-world review artifact integrity evidence lives in docs/plans/phase-60-selected-world-artifact-integrity-evidence-2026-05-23.md and is reproduced by scripts/smoke_phase60_selected_world_artifact_integrity.py.
  • The Phase 52 exit gate is #410 Phase 52 exit gate, which closed after post-merge validation on main.
  • The Phase 53 exit gate is #418 Phase 53 exit gate, which closed after post-merge validation on main.
  • The Phase 54 exit gate is #426 Phase 54 exit gate, which closed after post-merge validation on main.
  • #427 Phase 54: sync repo truth after Phase 53 closeout and define runtime gate is closed by PR #429.
  • #428 Phase 54: refresh runtime measurement and decide async contract boundary is closed by PR #430 and records the Phase 54 Runtime Measurement and Async Contract Decision.
  • Keep synchronous generation for v1. Defer async task contract ratification.
  • #397 Phase 50: sync repo truth after Phase 49 closeout is closed by PR #399.
  • #398 Phase 50: measure runtime generation duration before task_id decision is closed by PR #400.
  • #401 Phase 50: ratify private-beta launch hub and public-path boundary is closed by PR #402.
  • Phase 50 Product Boundary Decision: launch hub remains planning-only for now; current tracked code keeps / as the guided public demo.
  • #404 Phase 51: sync repo truth after Phase 50 closeout is closed by PR #407.
  • #405 Phase 51: ratify private-beta route ownership and launch-hub contract is closed by PR #408.
  • #406 Phase 51: verify runtime readiness thresholds and world-scoped session guards is closed by PR #409.
  • Phase 51 Private-Beta Route Ownership Contract: private-beta launch hub remains planning-only; / and /review stay public-demo surfaces, while /worlds/<world_id> remains the private-beta candidate product path.
  • The Phase 51 route contract note lives in docs/plans/phase-51-private-beta-route-contract-2026-05-18.md.
  • The durable route ownership contract lives in docs/architecture/contracts.md and docs/decisions/ADR-0011-private-beta-route-ownership.md.
  • Phase 51 Runtime Readiness and World-Scoped Guard Verification keeps synchronous v1 generation, records route-derived worldId mutation guards, and lives in docs/plans/phase-51-runtime-readiness-guards-2026-05-18.md.
  • #411 Phase 52: sync repo truth after Phase 51 closeout and define successor gate is closed by PR #414.
  • #412 Phase 52: audit legacy top-level runtime routes and preserve boundary contract is closed by PR #415.
  • #413 Phase 52: strengthen runtime mutation guard regression baseline is closed by PR #416.
  • Phase 52 focused on legacy top-level runtime routes and runtime mutation guard regression coverage without widening public/plugin/async contracts.
  • The Phase 52 Legacy Top-Level Runtime Route Audit note lives in docs/plans/phase-52-legacy-runtime-route-audit-2026-05-18.md.
  • The Phase 52 Runtime Mutation Guard Regression Baseline note lives in docs/plans/phase-52-runtime-mutation-guard-regression-2026-05-18.md and keeps route-derived worldId guard coverage in scope.
  • #419 Phase 53: sync repo truth after Phase 52 closeout and define transfer gate is closed by PR #422.
  • #420 Phase 53: audit transfer assumptions and third-world readiness constraints is closed by PR #423.
  • #421 Phase 53: add bounded third-world transfer readiness evidence is closed by PR #424.
  • Phase 53 strengthened bounded transfer generalization and third-world readiness evidence without widening public demo, plugin, Hosted GPT/BYOK, launch hub, async, or runtime mutation boundaries.
  • The completed Phase 53 Successor Gate lives in docs/plans/phase-53-successor-gate-2026-05-19.md.
  • The completed Phase 53 Transfer Assumption Audit lives in docs/plans/phase-53-transfer-assumption-audit-2026-05-19.md.
  • The completed Phase 53 Third-World Transfer Evidence note lives in docs/plans/phase-53-third-world-transfer-evidence-2026-05-19.md and records library-rain.
  • The completed Phase 54 Successor Gate lives in docs/plans/phase-54-successor-gate-2026-05-19.md.
  • The Phase 54 Runtime Measurement and Async Contract Decision lives in docs/plans/phase-54-runtime-measurement-async-contract-decision-2026-05-19.md.
  • Phase 54 covered runtime measurement and async contract decision work without implementing async workers, task_id, launch hub, public path, plugin, Hosted GPT/BYOK, or runtime mutation expansion.
  • Phase 54 decision posture: public demo, plugin, Hosted GPT/BYOK, launch hub, async, and runtime mutation boundaries remain unchanged.
  • The completed Phase 55 Successor Gate lives in docs/plans/phase-55-successor-gate-2026-05-20.md.
  • Phase 55 covered analysis-first main-path and review-surface guardrail work without implementing async workers, task_id, launch hub, public path, plugin, Hosted GPT/BYOK, or runtime mutation expansion.
  • #432 Phase 55 exit gate is closed after post-merge validation; #433 closed by PR #436, #434 closed by PR #437, and #435 closed by PR #438.
  • The Phase 56 Successor Gate closeout note lives in docs/plans/phase-56-successor-gate-2026-05-20.md.
  • Phase 56 covers source-verified candidate promotion and review-continuity guardrail work without implementing async workers, task_id, launch hub, public path, plugin, Hosted GPT/BYOK, or runtime mutation expansion.
  • #440 closed by PR #447 after post-merge validation; #441 closed by PR #444, #442 closed by PR #445, and #443 closed by PR #446.
  • The Phase 57 Successor Boundary lives in docs/plans/phase-57-successor-boundary-2026-05-20.md.
  • Phase 57 is closed after PR #451; #448 closed by PR #451, #449 closed by PR #450, milestone Phase 57 - Post-Phase-56 Repo Truth Sync and Successor Boundary is closed, and audit-github-queue reports paused with no active milestone.
  • The Phase 58 Route Readiness Evidence Gate lives in docs/plans/phase-58-route-readiness-evidence-gate-2026-05-20.md.
  • The Phase 58 Route Readiness Snapshot Evidence lives in docs/plans/phase-58-route-readiness-snapshot-evidence-2026-05-20.md.
  • Phase 58 is closed after PR #458; #453 Phase 58 exit gate closed by PR #458, #454 Phase 58: sync repo truth after PR #452 and define route-readiness evidence gate closed by PR #456, #455 Phase 58: reproduce private-beta route-readiness snapshots with tracked smoke coverage closed by PR #457, milestone Phase 58 - Private-Beta Route Readiness Evidence Gate is closed, and audit-github-queue reports paused with no active milestone.
  • The Phase 59 Selected-World Route Continuity Gate lives in docs/plans/phase-59-selected-world-route-continuity-gate-2026-05-23.md.
  • Phase 59 is closed; #459 Phase 59 exit gate closed by PR #464, #460 Phase 59: sync repo truth after Phase 58 closeout and define selected-world route gate closed by PR #462, #461 Phase 59: add GET-only selected-world route smoke for Fog Harbor, Museum Night, and Library Rain closed by PR #463, milestone Phase 59 - Selected-World Route Continuity Evidence Gate is closed, and audit-github-queue reports paused with no active milestone.
  • The Phase 59 Selected-World Route Evidence lives in docs/plans/phase-59-selected-world-route-evidence-2026-05-23.md.
  • Phase 60 is closed; milestone Phase 60 - Selected-World Review Artifact Integrity Gate is closed, #465 Phase 60 exit gate, #466 Phase 60: sync repo truth after Phase 59 closeout and define artifact integrity gate, and #467 Phase 60: add selected-world review artifact integrity smoke define the closed queue; #465 closed by PR #470, #466 closed by PR #468, #467 closed by PR #469, and before Phase 61 opened audit-github-queue reported paused with no active milestone. The gate note lives in docs/plans/phase-60-selected-world-artifact-integrity-gate-2026-05-23.md, and the selected-world review artifact integrity evidence lives in docs/plans/phase-60-selected-world-artifact-integrity-evidence-2026-05-23.md with reproduction through scripts/smoke_phase60_selected_world_artifact_integrity.py.
  • #384 Phase 49: sync repo truth and protect runtime core lanes is closed by PR #385.
  • #386 Phase 49: ratify kernel trace and replay contract is closed by PR #387.
  • #388 Phase 49: ratify perturbation schema and resolver authoring contract is closed by PR #389.
  • #390 Phase 49: ratify runtime parent-child compare emission policy is closed by PR #391.
  • #392 Phase 49: ratify runtime latest-activity metadata and rollback scope is closed by PR #393.
  • #394 Phase 49: strengthen transfer eval outcome coverage is closed by PR #395.
  • The completed Phase 47 successor-gate baseline lives in docs/plans/phase-47-successor-gate-2026-05-16.md.
  • The completed Phase 48 successor-gate baseline lives in docs/plans/phase-48-successor-gate-2026-05-17.md.
  • The completed Phase 49 successor-gate baseline lives in docs/plans/phase-49-successor-gate-2026-05-18.md.
  • The completed Phase 50 successor-gate baseline lives in docs/plans/phase-50-successor-gate-2026-05-18.md.
  • The completed Phase 51 successor-gate baseline lives in docs/plans/phase-51-successor-gate-2026-05-18.md.
  • The completed Phase 52 successor-gate baseline lives in docs/plans/phase-52-successor-gate-2026-05-18.md.
  • The completed Phase 53 successor-gate baseline lives in docs/plans/phase-53-successor-gate-2026-05-19.md.
  • The completed Phase 53 transfer-assumption audit baseline lives in docs/plans/phase-53-transfer-assumption-audit-2026-05-19.md.
  • The completed Phase 53 third-world evidence baseline lives in docs/plans/phase-53-third-world-transfer-evidence-2026-05-19.md and records library-rain.
  • Local untracked private-beta, kernel, and design-system planning files under docs/plans/... are candidate inputs only until a PR intentionally promotes them.
  • Protected-core changes require read-only subagent review before merge, but lane:protected-core and risk:core-contract do not require a separate human approval when required checks, local validation, and the subagent review all pass.
  • status:needs-adr and unresolved risk:safety remain auto-merge blockers until the ADR or safety review is resolved.
  • docs/plans/long-running-loop-runbook.md is the operational handoff note for authenticated queue audit, worktree pickup, and post-merge checkpointing.
  • The previous local queue follow-up automation and Mirror-specific cron/heartbeat automations have been revoked per operator request; do not recreate an automation without a new explicit request.