Action needed: withdraw testnet deposits before the vault migration #351
collinsezedike
announced in
Announcements
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
If you have USDC deposited in the current Meridian vault on testnet, please withdraw before the vault migration merges.
#329 introduces a new coordinator vault architecture and will deploy at a new contract address. The current vault keeps running unchanged, and your funds are not at risk. However, once the app's config switches to the new vault, the frontend will no longer point to the old contract address. Your position will still be technically withdrawable, but only through a direct contract call (Stellar CLI or similar), not through the UI.
Withdraw your position from the current vault now, either through the app or directly, before this migration lands. There is no automatic fund migration between the old and new vault contracts.
If you have questions, kindly ask here or open a Discussion under Q&A.
Back to building.
— Collins
Beta Was this translation helpful? Give feedback.
All reactions