Skip to content

fix 0 max power boiler #575

fix 0 max power boiler

fix 0 max power boiler #575

Triggered via push November 26, 2025 12:50
Status Failure
Total duration 3m 0s
Artifacts
Linting
37s
Linting
Sphinx doc check
55s
Sphinx doc check
Matrix: Tests
Matrix: Tutorial tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests (3.10, ubuntu-latest)
Process completed with exit code 1.
Tests (3.10, windows-latest)
The strategy configuration was canceled because "tests._3_10_ubuntu-latest" failed
Tests (3.10, windows-latest)
The operation was canceled.
Tests (3.11, windows-latest)
The strategy configuration was canceled because "tests._3_10_ubuntu-latest" failed
Tests (3.11, windows-latest)
The operation was canceled.
Tests (3.11, ubuntu-latest)
The strategy configuration was canceled because "tests._3_10_ubuntu-latest" failed
Tests (3.11, ubuntu-latest)
The operation was canceled.