Skip to content

Planner should handle SP/RoT/RoT bootloader rollback protection #8958

@karencfv

Description

@karencfv

As per RFD349, the SP/RoT/RoT bootloader will use an epoch based system for rollback protection.

This means that once the EPOC field is populated, the planner should make use of it to verify that the EPOC in the artifact's caboose is larger than the one reported by the inventory's caboose.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Update SystemReplacing old bits with newer, cooler bits

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions