When setting the time dimension of a layer to 100 BC, the TimeManager plugin in QGIS fails to correctly interpret the BC date format. Additionally, the minimum value in the time control slider only goes down to 1 AD. Is it possible to modify the plugin to support BC dates?
the TimeManager plugin show below:
