Skip to content

Version 2.0.57: Critical production hotfix #5

Version 2.0.57: Critical production hotfix

Version 2.0.57: Critical production hotfix #5

Triggered via push July 21, 2025 16:58
Status Failure
Total duration 1m 21s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.9)
Process completed with exit code 1.
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_9" failed