Skip to content

temporal_merge: Refactor temporal_merge_plan for clarity #81

temporal_merge: Refactor temporal_merge_plan for clarity

temporal_merge: Refactor temporal_merge_plan for clarity #81

Triggered via push September 26, 2025 12:27
Status Failure
Total duration 1m 5s
Artifacts

regression.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
PostgreSQL 12
Process completed with exit code 2.
PostgreSQL 13
Process completed with exit code 2.
PostgreSQL 16
Process completed with exit code 2.
PostgreSQL 16
The strategy configuration was canceled because "test._12" failed
PostgreSQL 11
The operation was canceled.
PostgreSQL 11
The strategy configuration was canceled because "test._12" failed
PostgreSQL 15
The operation was canceled.
PostgreSQL 15
The strategy configuration was canceled because "test._12" failed
PostgreSQL 14
Process completed with exit code 2.
PostgreSQL 14
The strategy configuration was canceled because "test._12" failed