Skip to content

Conversation

def-
Copy link
Contributor

@def- def- commented Oct 13, 2025

Seen in https://buildkite.com/materialize/test/builds/110546#0199df3e-8a27-433d-b9a6-6cfee8df1571

It seems like #33526 has changed some timing, which made us run into this.

Checklist

  • This PR has adequate test coverage / QA involvement has been duly considered. (trigger-ci for additional test/nightly runs)
  • This PR has an associated up-to-date design doc, is a design doc (template), or is sufficiently small to not require a design.
  • If this PR evolves an existing $T ⇔ Proto$T mapping (possibly in a backwards-incompatible way), then it is tagged with a T-proto label.
  • If this PR will require changes to cloud orchestration or tests, there is a companion cloud PR to account for those changes that is tagged with the release-blocker label (example).
  • If this PR includes major user-facing behavior changes, I have pinged the relevant PM to schedule a changelog post.

@def- def- requested review from DAlperin and petrosagg October 13, 2025 21:25
@def- def- enabled auto-merge October 13, 2025 21:33
@def- def- merged commit ae7cf35 into MaterializeInc:main Oct 14, 2025
118 checks passed
@def- def- deleted the pr-fix-source-status-check branch October 14, 2025 16:09
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants