Skip to content

About

Second project of Methods and tools for industrial automation (Scheduling)

Topics

Resources

Stars

1 star

Watchers

0 watching

Forks

Latest commit

 

History

70 Commits

Folders and files

Repository files navigation

Secondo Progetto (Scheduling)

Methods and tools for industrial automation

Introduction:

Please refer to the problem described in the following link: Dynamic programming | Set 34 (Assembly line scheduling).

  • Prepare a presentation and a short document to illustrate it
  • Implement it in Matlab
  • Verify its performance with respect to a brute force approach
  • Extend it to a different configuration at your choice
  • Extend the algorithm to print the path covered by the car chassis in the factory.

Done:

  • Dynamical programming solution
  • Brute forcing solution

TBD:

  • Mathematical programming solution

About

Second project of Methods and tools for industrial automation (Scheduling)

Topics

Resources

Stars

1 star

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages