Skip to content

docs(spec): SHIP-TWO-001 §64 — mid-cascade status snapshot (15-PR cascade summary; gx10 164-run in flight)#1625

Closed
noahgift wants to merge 1 commit into
mainfrom
docs/section-64-clean
Closed

docs(spec): SHIP-TWO-001 §64 — mid-cascade status snapshot (15-PR cascade summary; gx10 164-run in flight)#1625
noahgift wants to merge 1 commit into
mainfrom
docs/section-64-clean

Conversation

@noahgift
Copy link
Copy Markdown
Contributor

Summary

Records the cumulative state of the post-§60 §17.5 LIVE-discharge cascade at 2026-05-11 ~15:00 UTC. Canonical entry point for future sessions joining the cascade cold.

§17.5 PARTIAL chain status

AC Status LIVE-discharge PR
SHIP-002 DISCHARGED #1609
SHIP-005 IN PROGRESS gx10 164-run pending (~1.2h)
SHIP-006 DISCHARGED #1615
SHIP-007 MULTI-PR SCOPE §63 documents 3-layer CUDA blocker
SHIP-008 DISCHARGED #1614

3 of 5 LIVE-discharged this session.

What's running NOW

  • gx10 (Blackwell GB10, aarch64): apr eval --task humaneval on canonical 7B APR teacher; CPU 1022%, GPU 0% (Blackwell JIT bug; CPU path); ~123/164 problems done at 105s/problem; ETA ~1.2h.
  • lambda-vector: GPU freed per user request.

§61.8 Branch A fully closed (3 PRs)

Cascade-this-session PR roll (15 PRs)

10 merged + 4 BLOCKED (CI queue) + 1 pending (this PR).

Methodology lessons #6-#11 (cumulative)

Ship-% movement

  • MODEL-1: 94% (will flip to 95% on SHIP-005 LIVE)
  • MODEL-2: 57% unchanged

🤖 Generated with Claude Code

…-SHIP-TWO-SECTION-64)

§64 records the cumulative state of the post-§60 §17.5 LIVE-discharge
cascade at 2026-05-11 ~15:00 UTC. Canonical entry point for future
sessions joining the cascade cold.

§17.5 chain: 3 of 5 PARTIALs LIVE-discharged (SHIP-002 via #1609,
SHIP-006 via #1615, SHIP-008 via #1614). SHIP-005 LIVE evidence in
progress on gx10 (~123/164 problems done; ETA ~1.2h; lambda-vector
freed per user request). SHIP-007 scope-bounded as multi-PR cascade
per §63.

§61.8 Branch A fully closed across 3 PRs (#1615/1616/1617 — lesson
#10). Branch B closure via #1612 (lesson #9).

15-PR session cascade against SHIP-TWO-001 (2026-05-10 → 2026-05-11):
10 merged + 4 in CI queue + 1 pending (this PR).

MODEL-1 ship %: 94% (will flip to 95% on SHIP-005 from gx10 164-run).
MODEL-2 ship %: unchanged at 57%.

Cumulative methodology lessons #6-#11 captured.

Changes (1 spec file):
- Atomic next action: v3.09.0 → v3.10.0
- New §64 with 9 sub-sections recording snapshot state, what's
  running, empirical prior, PR roll, ship-% movement, and
  cumulative methodology lessons

Closes task #38 PMAT-CODE-SHIP-TWO-SECTION-64.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@noahgift noahgift enabled auto-merge (squash) May 11, 2026 15:03
@noahgift
Copy link
Copy Markdown
Contributor Author

Closing as superseded — the §65→§71 cascade narrative is complete on main via PRs #1629/#1631/#1633/#1634/#1636/#1642 (and the in-tree §67/§68/§69/§70/§71 sections). SHIP-005 LIVE-DISCHARGED at 86.59% pass@1 (§71); see contracts/apr-eval-humaneval-harness-invariant-v1.yaml v1.1.0 for the empirical evidence and root cause.

@noahgift noahgift closed this May 12, 2026
auto-merge was automatically disabled May 12, 2026 15:30

Pull request was closed

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant