Skip to content

Pull requests: metal3-io/project-infra

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Add prow job in BMO to generate CR documentation do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#1108 opened Sep 25, 2025 by MahnoorAsghar Loading…
🌱 Add FKAS build to PR checks size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#1102 opened Sep 19, 2025 by peppi-lotta Loading…
Add support for IPv6 test do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#1068 opened Aug 20, 2025 by nuhakala Draft
Add tool to compare built ipa and master ipa initramfs size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#1058 opened Jul 29, 2025 by peppi-lotta Loading…
🌱 Add new reusable release note generator size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#944 opened Jan 9, 2025 by mquhuy Loading…
ProTip! Filter pull requests by the default branch with base:main.